Objectives and strategy of London Mining in CGMR


Objectives and strategy
London Mining’s objective is to identify, develop and operate scalable mines to become a mid-tier supplier to the global steel industry. The Group’s principal assets have actual or anticipated production and the ability for further expansion through either upgrading resources or acquisition.
The Company is currently undertaking resource definition programmes to ensure that all of these principal projects will have JORC standard resources in accordance with the time frames set out in this document.
The Directors believe that the total iron ore concentrate production capacity of the Group’s four principal projects (on a 100% basis) has the potential to rise from 0.4Mtpa in 2009 to 14Mtpa in 2014 and to in excess of 20Mtpa in 2018:
• Sierra Leone – sinter feed : 1.5Mtpa in 2011 to in excess of 3Mtpa in 2013
• Saudi Arabia – DR pellets : 5Mtpa in 2013 to 10Mtpa in 2017
• Greenland – DR pellet feed : 5Mtpa in 2014 to 10Mtpa in 2018
• China – magnetite concentrate : 0.4Mtpa in 2009 to 1Mtpa in 2011
(Source: Company estimates)
The strategy of London Mining is to focus its activities on deliverable iron ore projects, where the key features are scalable production, financing opportunities and a clear route to market. The ability to accelerate projects through to efficient producing mines, utilizing its experienced technical and operating team, is an important part of the Company’s strategy.
The Group’s principal projects range from late stage exploration projects, through a brownfield site to an under-optimized producing mine, all of which the Company intends to develop to be efficient producing mines. All of the Group’s principal assets have an ore body and logistics solution which allow for production to be initiated and/or expanded in phases. The logistics solution primarily focuses on workable port locations with available land and with the ability to load, either directly or via transhipment, to ocean going vessels. The port locations are all within approximately 100km of the proposed mine site for all of the existing principal projects with the exception of China, where the product is largely sold at the mine gate, hence transportation costs are low. Currently, London Mining’s target markets are the MENA countries and China, and all of the principal assets are able to supply one or both of these markets.
The Company has an experienced management and technical team. The iron ore assets are managed by in country project directors aided by a technical services team headed by the Company’s Chief Operating Officer, Luciano Ramos and comprising seven people with expertise in geology, metallurgy and mine engineering. The technical services team is focused on delivering low-cost, fast track solutions to production. The iron ore assets are overseen by the Company’s management team in London, which focuses on head office functions including funding, off-take agreements and corporate development opportunities.

Advertisements

One thought on “Objectives and strategy of London Mining in CGMR

  1. This does not mean, necessarily, letting down your guard and pouring your heart out about how much you love your grandmother. The whole professional vs. personal ratio also has to be calculated with your topic and target audience in mind. Anything that wouldn’t be appropriate to say to a client in person or in an email shouldn’t be included on a business blog.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s